Open circuit test on transformers is conducted to determine
A) hysteresis losses
B) copper losses
C) core losses
D) eddy current losses
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q10: An ideal transformer will have maximum efficiency
Q11: The size of a transformer core will
Q12: The changes in volume of transformer cooling
Q13: Which of the following is the main
Q14: The transformer laminations are insulated from each
Q16: For the parallel operation of single phase
Q17: Power transformers are generally designed to have
Q18: In an actual transformer the iron loss
Q19: N atural air coo ling is generally
Q20: During short circuit test iron losses are