Multiple Choice
Which lean tool is considered the baseline for Kaizen events?
A) Determination of the sequence of operator tasks.
B) Standardization of work in the environment.
C) Calculation of Takt time.
D) Building an inventory of equipment needed for processes.
Correct Answer:

Verified
Correct Answer:
Verified
Q76: The second part of Jidoka includes separating
Q77: Which process improvement diagram, picture, or chart
Q78: Which level of sigma results in 6,210
Q79: Design for Manufacturability is a team approach
Q80: Visual signs are encouraged in the workplace
Q82: Appropriate communication techniques are necessary indifferent situations
Q83: Lean improvements use the frame work from
Q84: Quick changeover setup reduction (SMED) allows a
Q85: Which of the following is the reason
Q86: DFx or design for product life cycle