Multiple Choice
If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by
A) mid-section formula
B) trapezoidal formula
C) prismoidal formula
D) all the above
Correct Answer:

Verified
Correct Answer:
Verified