Multiple Choice
A track of width 1 to 1.2 m constructed along the selected alignment to facilitate access to the area for inspection and detailed survey is known as
A) inspection trace
B) terrain
C) trace out
D) all of these
Correct Answer:

Verified
Correct Answer:
Verified
Q13: The transverse joint may be a<br>A)expansion joint<br>B)contraction
Q14: The transverse contraction joints in unreinforced concrete
Q15: The width of parking spaces is effected
Q16: In scanty rainfall areas, the camber provided
Q17: Traffic engineering deals with the<br>A)traffic operation<br>B)design and
Q19: The California bearing ratio (CBR) method of
Q20: Which of the following statement is correct?<br>A)The
Q21: A curve whose radius gradually changes from
Q22: An ideal vertical curve is a cubic
Q23: At the end of the reconnaissance phase,