True/False
The cost in a cost raster usually represents the sum of a number of cost factors.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q13: A raster that assigns each cell to
Q14: The surface distance _ when the elevation
Q15: Name three network attributes that are normally
Q16: Least-cost path analysis is _based, and network
Q17: Link impedance for network applications can be
Q19: Shortest-path analysis is used to solve the
Q20: Explain the difference between a network and
Q21: Which of the following is true about
Q22: A _ link connects a cell to
Q23: Cost distance measure operations are based on