ADAMS Electricals has decided to analyze the job flow of their shop to see if a more effective layout can be designed to reduce average job lead time. They have 6 processing departments in the shop, positioned as shown below. The vertical distance between departments is 30 feet while the horizontal distance is 45 feet. Assume that diagonal moves are not possible.
For a typical day, the number of jobs moving from one department to the next is shown in the matrix below.
-How much distance is traveled by the 6 jobs from Department D to Department B?
A) 450 feet
B) 120 feet
C) 525 feet
D) 75 feet
E) Need more information to answer the question
Correct Answer:

Verified
Correct Answer:
Verified
Q74: Use the Cluster-first-route-second heuristic for two trucks
Q75: Use the Clark and Wright savings heuristic
Q76: Assume a facility is open 8 hours
Q77: The following is a sketch of process-focused
Q78: Use the Clark and Wright savings heuristic
Q80: ADAMS Electricals decided to analyze the job
Q81: The process design team at a medical
Q82: Assuming that the customers are ranked
Q83: Assuming that the customers are ranked in
Q84: William is considering a dispatch rule to