A bottling machine produces an average of 11,500 units per week during the winter months, when its maximum sustainable throughput is 15,000 units per week. During the summer months, the machine produced 16,000 units per week when its maximum sustainable throughput was raised to 20,000 per week.
-Calculate the capacity utilization of the machine during the winter based on the above information.
A) 76.7%
B) 106.7%
C) 57.5%
D) 80.0%
E) Do not have enough information to compute
Correct Answer:

Verified
Correct Answer:
Verified
Q23: A bottling machine produces an average of
Q24: Sunderland Furniture is determining the make or
Q25: A bottling machine produces an average of
Q26: Bob Thornton and his staff can normally
Q27: Three processes have the following costs: Process
Q29: Sunderland Furniture is determining the make or
Q30: Classroom effective capacity = 120 students<br>Actual classroom
Q31: Sunderland Furniture is determining the make or
Q32: A bottling machine produces an average of
Q33: A bottling machine produces an average of