Multiple Choice
The critical resources that can limit the output level of the entire system are referred to as:
A) Constraints
B) Nonconstraints
C) Failure points
D) Weakest links
Correct Answer:

Verified
Correct Answer:
Verified
Q1: The time lost by the nonconstraint is
Q2: Match these items.<br>-Best operating level<br>A) When demand
Q3: Which of the following statements is true
Q5: Match these items.<br>-Rough-cut capacity planning<br>A) When demand
Q6: Rough-cut capacity planning is completed at the
Q7: Match these items.<br>-Capacity Requirements Planning<br>A) When demand
Q8: Match these items.<br>-Level production<br>A) When demand and
Q9: Costs associated with level production aggregate planning
Q10: If a service temporarily met demand that
Q11: A mismatch between demand and design capacity