Multiple Choice
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.
-Prepare addenda for pricing
A) Design development
B) Construction documents
C) Bidding and award
D) Construction
E) Project closeout
Correct Answer:

Verified
Correct Answer:
Verified
Q35: Which of the following would be considered
Q36: The field office would typically accomplish which
Q37: Which of the following would have the
Q38: In a guaranteed maximum price (GMP) contract,
Q39: Which category of construction is the largest?<br>A)
Q41: Which category of construction would typically be
Q42: A structural engineer is responsible for locating
Q43: Identify in which listed project phase each
Q44: The use of material safety data sheets
Q45: Cost indices reflect changes in cost over