Multiple Choice
Match the description with the terms listed.Terms may be used only once.
-States requirements and procedures for responsive bid
A) Invitation to bid
B) Specifications and drawings
C) Owner-furnished items
D) Construction schedule
E) General conditions
Correct Answer:

Verified
Correct Answer:
Verified
Q44: The use of material safety data sheets
Q45: Cost indices reflect changes in cost over
Q46: Which of the following would not be
Q47: Career opportunities as a construction professional would
Q48: Which of the project types listed would
Q50: Which of the following situations requires a
Q51: Identify in which listed project phase each
Q52: Dams, highways, and bridges would be classified
Q53: Drawings and specifications are the output of
Q54: Value engineering is normally the responsibility of