Short Answer
A(n) ________ test simply monitors a signal for errors and is only done when a circuit is already down or a maintenance window has been scheduled.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q20: Most telecommunications equipment, including the switch, requires
Q21: Switch-to-switch connections are always _ circuits whether
Q22: For a switch to be able to
Q23: Only the largest switch sites have digital
Q24: A very important concept in the world
Q25: Cable from the outside of a building
Q26: The _ circuit is the most common
Q28: A(n) _ test disrupts service.
Q29: The horizontal side of the MDF provides
Q30: The equipment placed in the transmission room