Multiple Choice
Solve the problem.
-A contractor mixes concrete from bags of pre- mix for small jobs. How many bags with cement should he mix with 7 bags of cement to produce a mix containing cement?
A) 21 bags
B) 11 bags
C) 16 bags
D) 9 bags
Correct Answer:

Verified
Correct Answer:
Verified
Q60: Solve the problem.<br>-Rachael's bike got a
Q61: Solve the system by graphing.<br>- <span
Q62: Solve the problem.<br>-Andy has 34 coins
Q63: Solve the problem.<br>-The difference between two numbers
Q64: Solve by the substitution method.<br>- <span
Q66: Solve by elimination.<br>- <span class="ql-formula" data-value="7
Q67: Solve by elimination.<br>- <span class="ql-formula" data-value="x-5
Q68: Solve the problem.<br>-A merchant has coffee
Q69: Decide whether or not the ordered
Q70: Solve the system by graphing.<br>- <span