True/False
Based on Boehm's findings, an erroneous requirement that goes undetected and unfixed until the operations phase may cost 1,000 times more than it would have cost if it were detected and fixed in the requirements phase.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q148: An interview question should be long and
Q149: A technique for generating ideas during group
Q150: A disadvantage of a questionnaire is that
Q151: To help set the context of a
Q152: Interviewing is a very time consuming process.
Q154: _ requirements are ones that are defined
Q155: A disadvantage of discovery prototyping is that
Q156: Preliminary investigation includes those techniques used by
Q157: Questionnaires are documents that allow the analyst
Q158: Interviewers should prepare an interview guide in