Multiple Choice
A methods and measurements analyst needs to develop a time standard for a certain task. In a preliminary study, he observed one of his workers perform this task five times, with the following results: What is the standard time for this task if the employee worked at a 25 percent faster pace than average and an allowance of 20 percent of the workday is used?
A) 80 seconds
B) 96 seconds
C) 100 seconds
D) 120 seconds
E) 125 seconds
Correct Answer:

Verified
Correct Answer:
Verified
Q9: The chart used to focus on busy
Q31: If there is a good chance that
Q53: Methods analysis is particularly valuable when it
Q55: In work sampling, how will increasing the
Q60: The manager of Lawn and Garden
Q61: Which sample proportion will require the largest
Q78: Predetermined time standards are usually based on
Q95: Process chart symbols do not include:<br>A)delay.<br>B)inspection.<br>C)operation.<br>D)rejection.<br>E)storage.
Q97: From the worker's perspective, an output-based pay
Q116: The symbols for operation, storage, transportation, inspection,