A Methods and Measurements Analyst for Timepiece, Inc What Is the Standard Time for This Task If the Develop
Multiple Choice
A methods and measurements analyst for Timepiece, Inc., needs to develop a time standard for the task of attaching a watch to a wristband. In a preliminary study, he observed one of his workers perform this task five times, with the following results: What is the standard time for this task if the employee worked at a 20 percent faster pace than average, and an allowance of 20 percent of job time is used?
A) 4.5 seconds
B) 5 seconds
C) 20 seconds
D) 28.8 seconds
E) 100 seconds
Correct Answer:

Verified
Correct Answer:
Verified
Q77: Work measurement concentrates on how long the
Q79: One important factor that influences productivity is
Q92: Asking a group of employees at a
Q98: Which is not a requirement for an
Q107: A job has a normal time of
Q110: A methods and measurement analyst wants to
Q153: The normal time for a job is
Q174: A simo chart includes:<br>A)delay.<br>B)storage.<br>C)transportation.<br>D)left/right hand movements.<br>E)inspection.
Q176: Methods analysis and motion study techniques develop
Q189: Trust is a factor influencing productivity.