Multiple Choice
The chair of the operations management department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic P/OM course are in control with regard to the number of students who fail the course. Accordingly, he sampled 100 final grades from last year for each instructor, with the following results:
What are the .95 (5 percent risk of Type I error) upper and lower control limits for the p-chart?
A) .95 and .05
B) .13 and .07
C) .1588 and .0412
D) .16 and .04
E) .1774 and .0226
Correct Answer:

Verified
Correct Answer:
Verified
Q29: Control limits used on process control charts
Q30: The process capability index (Cpk) may mislead
Q33: The chair of the operations management
Q34: A design engineer wants to construct
Q40: The following data occurs chronologically from
Q48: The traditional view is that the optimum
Q68: Process capability compares process variability to the
Q74: The variation of a sampling distribution isless
Q75: The sampling distribution can be assumed to
Q92: Range control charts are used to monitor