A quality inspector for Alpha-Beta Co. is concerned about the quality of the batch of several thousand blank DVD disks which his company produced this week and is preparing to ship. If the cost of replacing a defective DVD disk once it has been shipped is $2.00, while the cost of 100 percent inspection prior to shipment is $.40 each, at what point is he indifferent between 100 percent inspection and shipment without inspection?
A) 0 percent defectives
B) 2 percent defectives
C) 5 percent defectives
D) 20 percent defectives
E) 30 percent defectives
Correct Answer:

Verified
Correct Answer:
Verified
Q38: Which of the following is associated with
Q39: The quality manager for Microelectronics, Inc., is
Q40: In a single-sampling plan, the entire lot,
Q41: Flexible acceptance sampling revises the sampling plan
Q42: The quality manager for Graphics, Inc., is
Q44: A lot can be "accepted" or "rejected"
Q45: The ability of an acceptance sampling plan
Q46: Sampling plans typically specify:<br>A) lot size.<br>B) sample
Q47: Acceptance sampling is a form of inspection
Q48: Acceptance sampling is applied to batches of