Multiple Choice
When converting to the new system,a company uses the ________ approach by operating the old system along with the new system for a period of time.
A) direct cutover
B) phase-in
C) pilot
D) parallel systems
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q125: Programmers use stepwise refinement or _ design
Q126: Match the term on the left to
Q127: Periodic evaluation of the new system is
Q128: During system design,the systems analyst uses a
Q129: _ feasibility determines if the cost for
Q131: A(n)_ is a set of steps used
Q132: A compiler translates the source code of
Q133: In the programming process,testing the algorithm checks
Q134: A _ control structure tells a computer
Q135: The control structure used to make logical