Multiple Choice
The operations manager for the Blue Moon Brewing Co. produces two beers: Lite (L) and Dark (D) . Two of his resources are constrained: production time, which is limited to 8 hours (480 minutes) per day; and malt extract (one of his ingredients) , of which he can get only 675 gallons each day. To produce a keg of Lite beer requires 2 minutes of time and 5 gallons of malt extract, while each keg of Dark beer needs 4 minutes of time and 3 gallons of malt extract. Profits for Lite beer are $3.00 per keg, and profits for Dark beer are $2.00 per keg. What is the time constraint?
A) 2 L + 3 D ≤ 480
B) 2 L + 4 D ≤ 480
C) 3 L + 2 D ≤ 480
D) 4 L + 2 D ≤ 480
E) 5 L + 3 D ≤ 480
Correct Answer:

Verified
Correct Answer:
Verified
Q67: The production planner for a private label
Q68: Which objective function has the same slope
Q69: The value of an objective function always
Q70: It has been determined that, with respect
Q71: The term isoprofit line means that all
Q73: The owner of Crackers, Inc., produces two
Q74: What combination of x and y will
Q75: The logistics/operations manager of a mail order
Q76: Every change in the value of an
Q77: Linear programming techniques will always produce an