Multiple Choice
_____ can be effective when quick delivery of the new system is critical or when the existing system must be replaced as soon as possible.
A) Direct Cutover
B) Parallel
C) Phased
D) All of these
E) None of these
Correct Answer:

Verified
Correct Answer:
Verified