Solved

You Operate a Geothermal Power Plant Here

Question 19

Multiple Choice

You operate a geothermal power plant here.After several years,the wells that have produced hot water and steam are beginning to run dry.If you want to install injection wells (wells that you can pump water into) ,so that you could recharge the groundwater circulation system and preserve the flow of hot water to your production well,where would you drill them? (Note: Lines are red (dark grey) at the end with the arrowhead and blue (light grey) nearer the ends without arrowheads.)
You operate a geothermal power plant here.After several years,the wells that have produced hot water and steam are beginning to run dry.If you want to install injection wells (wells that you can pump water into) ,so that you could recharge the groundwater circulation system and preserve the flow of hot water to your production well,where would you drill them? (Note: Lines are red (dark grey) at the end with the arrowhead and blue (light grey) nearer the ends without arrowheads.)    A)  by the blue arrows B)  by the red arrows C)  in between the blue and red arrows D)  at both the blue and red arrows


A) by the blue arrows
B) by the red arrows
C) in between the blue and red arrows
D) at both the blue and red arrows

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions