Multiple Choice
The products made by XYZ Corp during the last shift are all missing the bag of screws that should be in each box.What system control needs to be used at this point?
A) Concurrent control
B) Preliminary control
C) Rework control
D) Damage control
Correct Answer:

Verified
Correct Answer:
Verified