Multiple Choice
A primary consideration in assigning a cost to a responsibility center is ________.
A) whether the cost is fixed or variable
B) whether the cost is direct or indirect
C) who can best control the change in that cost
D) where in the organizational structure the cost was incurred
Correct Answer: