Multiple Choice
If a small-system development employing agile methods takes longer than planned,the overall cost is still likely to be smaller than if a full___________ were performed.
A) adaptive software development (ASD)
B) systems development life cycle (SDLC)
C) rational unified process (RUP)
D) dynamic systems development method (DSDM)
Correct Answer:

Verified
Correct Answer:
Verified