Multiple Choice
The cumulative lead time for a parent product is found by looking at the _____ lead-time path to obtain all of the parts that go into the end-item.
A) shortest
B) fastest
C) longest
D) both a and b
Correct Answer:

Verified
Correct Answer:
Verified