Roy is analyzing a 5-year project with an initial cost of $210,000,a required return of 16 percent,and a probability of success of 62 percent.If the project fails,it will generate an annual after-tax cash flow of -$48,500.If the project succeeds,the annual after-tax cash flow will be $79,000.He has further determined that if the project fails,he will shut it down after the first year and lose all of his original investment.If,however,the project is a success,he can expand it with no additional investment and increase the after-tax cash flow to $154,000 a year for Years 2-5.At the end of Year 5,the project would be terminated and have no salvage value.What is the net present value of this project at Time 0?
A) $46,655.42
B) $32,560.35
C) $47,297.19
D) $62,543.35
E) $59,297.19
Correct Answer:

Verified
Correct Answer:
Verified
Q70: The option to wait: I.may have minimal
Q71: Monte Carlo simulation is based on assigning
Q72: Last month,you introduced a new product to
Q73: The Short Stack expects to sell 8,000
Q74: ELK,Inc.has compiled this information for a proposed
Q75: Sensitivity analysis helps determine the<br>A)range of possible
Q76: To determine the lowest net present value
Q77: To set up a decision tree,you should<br>A)assign
Q79: Assuming the selling price is greater than
Q80: If a project breaks even on an