Multiple Choice
In a top-down design, the overall objectives of a system are broken down into _____ in a process called partitioning.
A) subsystems
B) flags
C) modules
D) pilot sites
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q26: _ measures a module's scope and processing
Q32: The objective of _ is to identify
Q36: <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB1345/.jpg" alt=" -A _, such
Q37: In sequence, the four steps typically followed
Q38: Program documentation _.<br>A) describes the inputs, outputs,
Q44: To achieve better, faster, and less expensive
Q50: _ is the process of putting a
Q54: In a structure chart,a control couple shows
Q67: After completing integration testing,a systems analyst must
Q75: When training is complete,many organizations conduct a