Multiple Choice
Value stream mapping (VSM) ______.
A) is typically done once an organization has converted to a lean system
B) facilitates identifying sources and causes of waste
C) has the potential to increase the carbon footprint
D) is applied only in push production systems
Correct Answer:

Verified
Correct Answer:
Verified
Q42: Which of the following is NOT a
Q43: Which of the following performance metrics is
Q44: The use of Lean Six Sigma has
Q45: Which of the following is true with
Q46: Throughput is _.<br>A)measured by the ratio of
Q48: During the backflush process,_.<br>A)parts that go into
Q49: Which of the following is NOT one
Q50: The Kanban system _.<br>A)can be used to
Q51: A just-in-time strategy _.<br>A)reduces investment in inventory
Q52: Lean production and just-in-time concepts became important