Multiple Choice
A continuous production process is most likely linked to which manufacturing environment?
A) MTO
B) ATO
C) MTS
D) ETO
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q19: In lot-for-lot lot sizing,_.<br>A)inventory holding costs are
Q20: The changes in firm planned orders _.<br>A)happen
Q21: A planned order release is a _
Q22: Which of the following reports can be
Q23: MRP outputs reports are available to _.<br>A)production
Q25: The current time bucket lies in which
Q26: Which system calculates materials,subassemblies,and components required for
Q27: The sales and operations plan designs products
Q28: Changes to the master schedule during the
Q29: The furthest time bucket from the current