Multiple Choice
ABC,Inc.,is a small clothing manufacturer that produces shirts and pants using two resources: sewing machine hours and cutting machine hours.The production manager can schedule up to 240 hours of sewing machine time and up to 150 hour cutting machine time.Production of one shirt requires 3 hours of sewing time and 1 hour of cutting time.Each pair of pants requires 2 hours of sewing time and 1.5 hours of cutting time.Each shirt yields a profit of $5,and each pair of pants generates a $6 profit.The objective is to maximize profits.Determine the nonnegative constraint for the LP formulation.Let X₁ = Number of shirts to be produced,X₂ = Number of pairs of pants to be produced.
A) X₁ and X₂ > 0
B) X₁ and X₂ ≥ 0
C) X₁ and X₂ ≤ 0
D) X₁ and X₂ = 0
Correct Answer:

Verified
Correct Answer:
Verified
Q30: ABC,Inc.,is a small clothing manufacturer that produces
Q31: In order to fertilize his vegetable farm,John,a
Q32: In order to fertilize his vegetable farm,John,a
Q33: A sensitivity analysis report generated by Excel
Q34: A school is trying to determine
Q36: Determining the shipment of goods from multiple
Q37: A school is trying to determine
Q38: A school is trying to determine
Q39: The resource constraints are modeled in LP
Q40: Under instances where the iso-profit line is