Multiple Choice
ABC,Inc.,is a small clothing manufacturer that produces shirts and pants using two resources: sewing machine hours and cutting machine hours.The production manager can schedule up to 240 hours of sewing machine time and up to 150 hour cutting machine time.Production of one shirt requires 3 hours of sewing time and 1 hour of cutting time.Each pair of pants requires 2 hours of sewing time and 1.5 hours of cutting time.Each shirt yields a profit of $5,and each pair of pants generates a $6 profit.The objective is to maximize profits.Determine sewing time constraint for the LP formulation.Let X₁ = Number of shirts to be produced,X₂ = Number of pairs of pants to be produced.
A) 3X₁ + 2X₂ ≤ 240
B) X₁ + 1.5X₂ ≤ 150
C) 3X₁ + 2X₂ ≤ 150
D) X₁ + 1.5X₂ ≤ 240
Correct Answer:

Verified
Correct Answer:
Verified
Q89: Consider the portion of the sensitivity
Q90: In order to fertilize his vegetable farm,John,a
Q91: In order to fertilize his vegetable farm,John,a
Q92: The limited availability of resources can be
Q93: Diamond Plywood,Inc.,manufactures four types of plywood panels.Each
Q95: Diamond Plywood,Inc.,manufactures four types of plywood panels.Each
Q96: At optimality,if the left-hand side values are
Q97: _ is the price one would will
Q98: A school is trying to determine
Q99: Consider the portion of the sensitivity