ABC,Inc.,is a small clothing manufacturer that produces shirts and pants using two resources: sewing machine hours and cutting machine hours.The production manager can schedule up to 240 hours of sewing machine time and up to 150 hour cutting machine time.Production of one shirt requires 3 hours of sewing time and 1 hour of cutting time.Each pair of pants requires 2 hours of sewing time and 1.5 hours of cutting time.Each shirt yields a profit of $5,and each pair of pants generates a $6 profit.The objective is to maximize profits.Determine cutting time constraint for the LP formulation.Let X₁ = Number of shirts to be produced,X₂ = Number of pairs of pants to be produced.
A) 3X₁ + 2X₂ ≤ 240
B) X₁ + 1.5X₂ ≤ 150
C) 3X₁ + 2X₂ ≤ 150
D) X₁ + 1.5X₂ ≤ 240
Correct Answer:

Verified
Correct Answer:
Verified
Q19: A school is trying to determine
Q20: The graphical method is appropriate for solving
Q21: XYZ manufactures four types of plywood panels.Each
Q22: The requirement of linear programming is that
Q23: In linear programming,advertising dollars budgeted for a
Q25: Changing the value of the objective coefficient
Q26: ABC,Inc.,is a small clothing manufacturer that produces
Q27: In order to fertilize his vegetable farm,John,a
Q28: In the Excel Solver parameters window,the cell
Q29: Diamond Plywood,Inc.,manufactures four types of plywood panels.Each