Multiple Choice
ABC,Inc.,is a small clothing manufacturer that produces shirts and pants using two resources: sewing machine hours and cutting machine hours.The production manager can schedule up to 240 hours of sewing machine time and up to 150 hour cutting machine time.Production of one shirt requires 3 hours of sewing time and 1 hour of cutting time.Each pair of pants requires 2 hours of sewing time and 1.5 hours of cutting time.Each shirt yields a profit of $5,and each pair of pants generates a $6 profit.The objective is to maximize profits.Determine cutting time constraint for the LP formulation.Let X₁ = Number of shirts to be produced,X₂ = Number of pairs of pants to be produced.Which one of the following is NOT one of the corner points (x1,x2) in this LP formulation?
A) (24,84)
B) (80,100)
C) (0,100)
D) (80,0)
Correct Answer:

Verified
Correct Answer:
Verified
Q62: Diamond Plywood,Inc.,manufactures four types of plywood panels.Each
Q63: Maureen,hospital administrator for Trinity Hospital,would like
Q64: Consider the portion of the sensitivity
Q65: Which of the following is NOT a
Q66: In the Excel Solver parameters window,which of
Q68: XYZ manufactures four types of plywood panels.Each
Q69: A school is trying to determine
Q70: Determining the supply of resources needed to
Q71: The price associated with a resource that
Q72: Enrobe Textiles,Inc.,is a small clothing manufacturer that