Multiple Choice
ABS specializes in repair and maintenance of industrial machines.One repair technician has been assigned to five identical grinding machines for repair and maintenance.The machine breaks down after about 20 hours of use,and breakdowns have a Poisson probability distribution.It takes 6 hours to repair a machine,and repair times follow an exponential distribution.Machine downtime costs the company $250 an hour,and the technician is paid $50 an hour.Determine the cost savings of having two technicians as compared to one technician.
A) $320.50
B) $100.50
C) $162.50
D) $175.00
Correct Answer:

Verified
Correct Answer:
Verified
Q65: In queuing theory,_ means that the number
Q66: Customers at an amusement park arrive at
Q67: Toll booths on expressways,banks on busy streets,and
Q68: In waiting line problems,the interarrival time is
Q69: In queuing theory,"random arrivals" means that _.<br>A)customers
Q71: An airport check-in and security-service system is
Q72: Which of the following is one of
Q73: Low level of service often results in
Q74: There are _ basic service system structures
Q75: When a variable's outcomes take on numerical