Multiple Choice
______ is the division of a single lot into two or more sublots and simultaneously processing each sublot on identical (or very similar) work centers as separate lots.
A) Lot processing
B) Lot splitting
C) Lot allocating
D) Lot wrapping
Correct Answer:

Verified
Correct Answer: