Solved

If the Results of Tests of Controls Support the Design

Question 20

Multiple Choice

If the results of tests of controls support the design and operations of controls as expected, the auditor uses ________ control risk as the preliminary assessment.


A) a lower
B) the same
C) a higher
D) either a lower or higher

Correct Answer:

verifed

Verified

Unlock this answer now