True/False
When the sample exception rate (SER) exceeds the tolerable exception rate (TER), the auditor should decide whether to increase sample size or to revise assessed control risk on the basis of cost versus benefit.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q36: One way to evaluate sampling risk when
Q37: When planning the audit sample, the _
Q38: If an auditor does a test in
Q39: When the sample exception rate is greater
Q40: Which of the following methods of sample
Q42: When analyzing exceptions, the auditor should keep
Q43: To determine if a sample is truly
Q44: In nonstatistical sampling, the calculated sampling error
Q45: Which of the following is a correct
Q46: The auditor finds material weaknesses in internal