Use this scenario for the following question(s) .
The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time, and predecessor as shown in the table. There are 7.5 productive hours available in a day and the manufacturer wishes to produce 400 units. Balance the line by assigning tasks to workstations to fill up as much takt time as possible. Break ties by assigning the longest task first.
-Refer to the scenario above. What is the theoretical minimum number of stations that will be used if the line is balanced using the appropriate takt time?
A) 3
B) 4
C) 5
D) 6
Correct Answer:

Verified
Correct Answer:
Verified
Q61: Name a service business that relies heavily
Q62: What are the four levels of customization
Q63: With the backyard poultry craze unleashing
Q64: A job shop manufacturing process is better
Q65: What is the optimal location for
Q67: The process design team at a
Q68: The table depicts a production line
Q69: The table depicts a production line
Q70: Provide an example (other than the one
Q71: An assemble-to-order process occurs upstream from:<br>A)design.<br>B)material sourcing.<br>C)fabrication.<br>D)assembly/finishing.