Multiple Choice
A mechanical cat is made of two front leg assemblies,a body assembly,one tail,one head assembly,and two back leg assemblies.Each head assembly has two eyes,one nose,one mouth,and 24 whiskers.Each back leg assembly has one foot,five claws,one each fibula,tibia,and femur.The cat production company runs a lot for lot system on everything except the legs,which they order in cases of 50,and the claws,which come by the gross.Lead time for assembly and shipping is shown in the table.Use the master production schedule for mechanical cats to complete the MRP record.What's the planned order release for claws in week 2?
A) 2,304
B) 2,376
C) 2,448
D) 2,880
Correct Answer:

Verified
Correct Answer:
Verified
Q6: Which step comes first in sales and
Q7: What are the third,fourth,and fifth jobs in
Q8: A deluxe model mechanical cat is made
Q9: A deluxe model mechanical cat is made
Q10: Material requirements planning is performed at greater
Q12: The table shows a master schedule for
Q15: Given the forecast and booked orders shown
Q33: Confirmed demand for products is called _
Q58: Forecasts in a company using a distribution
Q84: Gross requirements in an MRP record can