Multiple Choice
A mechanical cat is made of two front leg assemblies,a body assembly,one tail,one head assembly,and two back leg assemblies.Each head assembly has two eyes,one nose,one mouth,and 24 whiskers.Each back leg assembly has one foot,five claws,one each fibula,tibia,and femur.The cat production company runs a lot for lot system on everything except the heads,which they order in cases of 250,and the whiskers,which come in boxes of 800.Lead time for assembly and shipping is shown in the table.Use the master production schedule for mechanical cats to complete the MRP record.What are the net requirements for whiskers in week 2?
A) 5733
B) 5600
C) 5453
D) 5853
Correct Answer:

Verified
Correct Answer:
Verified
Q8: Since the booked orders figure represents actual
Q17: What are three advantages of using an
Q24: In distribution requirements planning the MRP records
Q36: A mechanical cat is made of two
Q38: With an inventory as shown in the
Q40: The process of _ occurs when a
Q41: Given the forecast and booked orders shown
Q42: There are 50 units in inventory at
Q43: Cow Company used the master schedule to
Q45: Consider the product structure tree shown below: