Hummingbird Manufacturing manufactures small parts and uses an activity-based costing system. Hummingbird Manufacturing manufactures small parts and uses an activity-based costing system.   The following parts were produced in October with the following information:   Total manufacturing costs for part B is A) $8,350. B) $12,350. C) $14,850. D) $18,850. The following parts were produced in October with the following information:
Hummingbird Manufacturing manufactures small parts and uses an activity-based costing system.   The following parts were produced in October with the following information:   Total manufacturing costs for part B is A) $8,350. B) $12,350. C) $14,850. D) $18,850. Total manufacturing costs for part B is


A) $8,350.
B) $12,350.
C) $14,850.
D) $18,850.