Question 93

Multiple Choice

All pieces of a project must be developed and assembled to produce the final product functionality.Designing,making,and assembling these components is the role of:


A) Configuration management.
B) Baseline scope control.
C) Systematic management.
D) Baseline configuration.

Correct Answer:

verifed

Verified