Multiple Choice
Surveys on the early warning signs of project failure indicate that a red flag for failure is:
A) The time to complete the project lengthens.
B) The low probability of achieving commercial objectives.
C) The political forces have turned against the project.
D) The benefits of the project won't be realized until the end.
Correct Answer:

Verified
Correct Answer:
Verified