Multiple Choice
The technique which can be used to estimate the percentage of time a worker or a piece of equipment is idle is:
A) MTM.
B) work sampling.
C) methods analysis.
D) micro-motion study.
E) none of these.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q115: Minimum wage legislation makes piece-rate compensation plans
Q116: The owner of Touchdown Sports Bar wants
Q117: Methods analysis techniques do not directly consider
Q118: The manager of Lawn and Garden Services
Q119: Which of the following plans is based
Q121: 11eab92b_c497_db26_99e6_41e4a133f802 If the person observed worked at
Q122: A work sampling study of dockworkers must
Q123: The behavioural approach to job design which
Q124: Piece rate pays are a common type
Q125: The criteria for the Healthy Workplace Award