Multiple Choice
For line balancing,cycle time is computed as:
A) daily operating time divided by the desired output.
B) desired output divided by the daily operating time.
C) daily operating time divided by the product of the desired output and the sum of job times.
D) the product of desired output and the sum of job times divided by daily operating time.
E) 1.00 minus station time.
Correct Answer:

Verified
Correct Answer:
Verified