Essay
Management wants to design an assembly line that will turn out 800 adult games per day.There will be eight working hours in each day.The industrial engineering staff has assembled the information below:
Determine the maximum and minimum cycle times.
(i)Determine the optimum cycle time.
(ii)What is the minimum number of stations needed?
(iii)Draw the precedence network.
(iv)Assign tasks to stations in order of most following tasks first.
Correct Answer:

Verified
Correct Answer:
Verified