Multiple Choice
The ultimate goal of lean systems is to have:
A) minimal in-process inventories.
B) empowered cross-trained workers.
C) a balanced,rapid flow of materials and products through the system.
D) reduced setup times.
E) small production lot sizes.
Correct Answer:

Verified
Correct Answer:
Verified
Q17: The maximum time allowed at each workstation
Q18: Which of the following is not considered
Q19: In the JIT approach,the content,sequence,and timing of
Q20: With regard to suppliers,JIT systems typically require:<br>A)delivery
Q21: The ideal scheduling for JIT/lean operations follows
Q23: JIT systems typically require that suppliers be
Q24: JIT purchasing requires frequent bidding for contracts
Q25: A kanban card is used to signal
Q26: Which of the following is not an
Q27: Which one of the following is not