Multiple Choice
The optimum level of inspection for quality control is where the:
A) cost of inspection is minimum.
B) cost of passing defectives is minimum.
C) total cost of inspection and passing defectives is maximum.
D) total cost of inspection and passing defectives is minimum.
E) difference in inspection and defectives costs is minimum.