Multiple Choice
Which of the following is not a step in the quality control planning process?
A) Define the quality characteristic to be controlled.
B) Determine a quality control point in the process.
C) Eliminate all defects found.
D) Plan how inspection is to be done.
E) All of the choices are steps.
Correct Answer:

Verified
Correct Answer:
Verified