Multiple Choice
After the auditor has prepared a flowchart of the accounting system and control procedures surrounding sales, and assessed the design of the system, the auditor would perform tests of controls for all control procedures:
A) documented in the flowchart.
B) considered to be deficiencies that might allow errors to enter the accounting system.
C) considered to be strengths that the auditor plans to use as a basis for an assessed level of control risk less than high.
D) that would aid in preventing irregularities.
Correct Answer:

Verified
Correct Answer:
Verified
Q26: For a complex system, auditors are least
Q27: Assessing control risk at less than high
Q28: Assessing control risk at less than high
Q29: Which of the following is an example
Q30: An input control is designed to ensure
Q32: After obtaining an initial understanding of a
Q33: How does the extent of substantive tests
Q34: When an independent auditor decides that the
Q35: To provide for the greatest degree of
Q36: When the auditor has assessed the level